Book a site inspection

Building Regulations require that any person carrying out building work should give us notice when the work has reached a particular stage. The prescribed stages are set out below.

Required notifications of building works
StageDescriptionTime
Stage 1Commencement2 days
Stage 2Foundation excavated (before concreting)1 day
Stage 3Foundation constructed(concrete laid)1 day
Stage 4Damp proof course (DPC)1 day
Stage 5Oversite (before concrete is laid)1 day
Stage 6Before covering any structural timbers, steelwork or concrete1 day
Stage 7Drains in trench (before covering over)1 day
Stage 8Drains backfilled (to be tested)5 days
Stage 9Occupation (if before completion)5 days
Stage 10Work completed5 days

The following are the stages at which notification should be given. Stage 6 is not mandatory but it is strongly recommended.

Book an inspection

Please contact us to book an inspection. We aim to visit a building site on the same day if the site inspection notification is received before 10:30am.

For inspection purposes, the district is split into two areas: east and west. See the map below.